Stewart Gulch Park

5070 Eyrie Way

DSCN1839.JPGOPEN HOUSE INFORMATION 

The first phase of the park’s construction included a playground, a picnic shelter, and a parking lot with sidewalks.
The second phase, known as ‘Greenup’ consists of planting trees, installing sod and irrigation systems, and a 6-foot-wide pathway connecting to Bison Drive. The masterplan also contemplates a restroom and basketball half-court.
We welcome your input and look forward to seeing you at the open house. If you are unable to attend, you may send comments via email at or phone (208) 608-7600.


Stewart Gulch Park offers a playground, sidewalks, shelter and a parking lot.

At the request of neighbors, the playground was designed to complement the Foothills environment. Play features include natural-colored climbing boulders and treehouse-themed play equipment for 2-5 and 5-12 year olds. 

Previously known as Medicine Creek Park, the park is located in the Medicine Creek subdivision. A master plan was completed in 1998. 

 

 

2-5 Playground

Swingsets: yes
Age group: 2-5

DSCN1841.JPGThe playground surface is comprised of rubber tiles made from recycled materials.

5-12 Playground

Swingsets: yes
Age group: 5-12

DSCN1842.JPGPlay features include natural-colored climbing boulders and treehouse-themed play equipment.

The playground surface is comprised of rubber tiles made from recycled materials.

Operating Hours

Park is open from sunrise to sunset.

Smoking Prohibition

Boise Smokefree Park SignSmoking and vaping are prohibited in all public parks, including within 20 feet of the Boise Greenbelt, except in designated areas within Ann Morrison and Julia Davis parks and city-owned golf courses.

Towing

Unauthorized vehicles will be towed at owner's risk and expense. Boise Valley Towing at (208) 389-9707.

Master Plan

A Master Plan is a concept drawing illustrating recreation facilities and landscape features planned for a park site.  It does not necessarily represent what amenities are currently in a park.